Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The following are the steps in the special development process. Questions about this process should be directed to Eping (Lucia) Wei, Transport Coordinator, at lma@mit.edu or 617-253-0231.

Fixes for issues found during Unit Testing in SF2

...

or SIT in SH2

...

Development steps:
  1. If necessary, revert each development object to be changed to the version currently in Production. In-process changes should be saved as a non-transportable copy of the object, as a downloaded text file, or as a printed listing.
  2. Change the development object(s) to implement the required fix.
  3. Perform unit testing in SF2.
  4. Release the transport(s) once unit tested
  5. Execute ZUTTREQ making sure SH2 is the 'To' environment
  6. Enter the transport(s) into the Transport # Sequence field within the SP 2015 ticket 
  7. During SIT, transport the fix to SH2 and test to confirm the efficacy of the fix.

...

  1. If necessary, revert each development object to be changed to the version currently in Production. In-process changes should be saved as a non-transportable copy of the object, as a downloaded text file, or as a printed listing.
  2. Change the development object(s) to implement the required fix in SF2 and SH1.
  3. Perform unit testing in SF2, SF2 /HANA & SF8SH1.
  4. Transport the fix to SH1, SH2 /HANA & SH2 (as part of the SP application process).
  5. Perform the usual regression and user-acceptance testing in SH1.
  6. Perform testing required to confirm the proper functioning of the fix in SH2 /HANA & SH2(as part of the SP application process).
  7. Obtain the required approvals.
  8. Transport the fix to Production.

...

What to do in ZUTTREQ:
     Check 'Critical' and 'To' environment as SH1. After approval, the R3 Admin team (r3-chmgt@mit.edu) will move the transport(s) to SH1 and SH2 and SH2/HANA.

Ongoing Projects with planned install in Production with Support Pack Go Live

...

Resumption of normal transport cycle

On December 167, 2015 2016 SAP system SH2 /HANA will be opened for normal testing activities to all IS&T SAP support personnel and business owners. The normal QA procedures (documents in the review folders, all business owner approvals captured, RT tickets updated) will resume at that time as well.  All changes approved on or after December 167, 2015 2016 will be considered part of the December 178, 2015 2016 transport cycle.

Transport Coordinator Instructions:

...