...
- If necessary, revert each development object to be changed to the version currently in Production. In-process changes should be saved as a non-transportable copy of the object, as a downloaded text file, or as a printed listing.
- Change the development object(s) to implement the required fix.
- Perform unit testing in SF2.
- Release the transport(s) once unit tested
- Execute ZUTTREQ making sure SH2 is the 'To' environment
- Enter the transport(s) into the Transport # Sequence field within the SP 2016 2018 ticketÂ
- During SIT, transport the fix to SH2 and test to confirm the efficacy of the fix.
...
{"serverDuration": 75, "requestCorrelationId": "9c7fa305d8ccd584"}