6) Pressure calculations inside the tank (structures)
7) Define off-nominal pressure thresholds and determine the corresponding follow-up action items (how to control the pressure)
Not a lot of people showed up, so those that did, sent them to LEONIRD meeting as they are interested in both projects. In the meantime, I was able to gather a bunch of information from the other sub-teams to make sure we are integrating well with them.
- Ellery getting extra stuff from Rocket Team we can use to test initial things on
- T&M x Controls specific work is going to be testing all of our FDIR logic, Activation, & Fault Handling (reference software slides in their CoDR slideshow 20-23)
- Data Management wants us to work on pressure off
- Talking to Masha about pressure sensor problem might be useful for us
- Structures finalizing pressure valve system → we need to know how to control it (prob PID system here)