The transport tracking goal is to move as much pending work to production as possible before the 11/10/2010 production freeze.


The transport request utility, ZUTTREQ, will be temporarily modified to send all requests to the Transport Coordinator. The coordinator will use this information to update the tracking spreadsheet and kept the statistics up-to-date.

Development Procedures

...

For the duration of the development freeze (11/1/2010-12/15/2010), a special development process should be used for development of fixes to SAP. The aim of this process is to avoid the introduction of non-support pack changes into the Support Pack test system (SH3) or the Production system (PS1).

The following are the steps in the special development process. Questions about this process should be directed to John Tuttle, Transport Coordinator at jrtuttle@mit.edu or 617-324-0097.