...
The following are the steps in the special development process. Questions about this process should be directed to John Tuttle, Transport Coordinator at jrtuttle@mit.edu or 617-324-0097.
Fixes for issues found during Unit Testing in SF2 or SIT in SH3
...
- If necessary, revert each development object to be changed to the version currently in Production. In-process changes should be saved as a non-transportable copy of the object, as a downloaded text file, or as a printed listing.
- Change the development object(s) to implement the required fix.
- Perform unit testing in SF2.
- During SIT and UAT, transport the fix to SH2 and test to confirm the efficacy of the fix.