The following are the steps in the special development process. Questions about this process should be directed to John Tuttle, Transport Coordinator at jrtuttle@mit.edu or 617-324-0097.

Fixes for issues found during Unit Testing in SF2 or SIT in SH3

...

  1. If necessary, revert each development object to be changed to the version currently in Production. In-process changes should be saved as a non-transportable copy of the object, as a downloaded text file, or as a printed listing.
  2. Change the development object(s) to implement the required fix.
  3. Perform unit testing in SF2.
  4. During SIT and UAT, transport the fix to SH2 and test to confirm the efficacy of the fix.