Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. If necessary, revert each development object to be changed to the version currently in Production. In-process changes should be saved as a non-transportable copy of the object, as a downloaded text file, or as a printed listing.
  2. Change the development object(s) to implement the required fix.
  3. Perform unit testing in SF2.
  4. During SIT and UAT, transport the fix to SH2 SH3 and test to confirm the efficacy of the fix.