Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The transport tracking goal is to move as much pending work to production as soon as possible, before the 5:00 pm 10/2120/2022 2023 production restricted window (the instructions for how to derive the details for the table below can be found by following the Transport Coordinator Instructions & Audit Process link on previous page in project Wiki).

 

Transport status

 


# of Transports as of 10/

07

06/

22

23


# of Transports as of 10/

14

13/

2022

23


# of Transports as of 10/

21

20/

2022

2023

 


# of Transports as of 11/

07

 

06/

2022

# of Transports POST GO-LIVE as of 12/05/22

2023


Comments

SF2 transports not released
59
49
60
51
565664
3949
 

SF2 Released not in SH2
196
143
195
137
196218216
76190
 

SF2 Released in SH2 not in PS1
105
116
114
120
341913
13610
 

SF3 Mods in SF2 not in SH2
12
3
88
333
 

SF3 Mods in SF2 SH2 not in PS1
12
00
16
0
 
3

See attached spreadsheets below for details.

SP2022 SP2023 Final Post Upgrade SH2-to-PS1 Transport List.xlsx

Post Go-Live SP2022 Open Transports 20221205SP2023 Full SF2-to-SH2 Transport List.xlsx

SP2022 SP2023 Open Transports 2022110720231006.xlsx

SP2022 SP2023 Open Transports 2022102120231013.xlsx

SP2022 SP2023 Open Transports 2022101420231020.xlsx

SP2022 SP2023 Open Transports 2022100720231106.xlsx