The transport tracking goal is to move as much pending work to production as soon as possible, before the 5:00 pm 10/20/2023 2024 production restricted window (the instructions for how to derive the details for the table below can be found by following the Transport Coordinator Instructions & Audit Process link on previous page in project Wiki).
| Transport status | # of Transports as of 10/ | 0604/ | 2324 | # of Transports as of 10/ | 1311/ | 2324 | # of Transports as of 10/ | 2018/ | 20232024 | # of Transports as of 11/ | 06/202304/2024 | Comments |
| SF2 transports not released | 4984 | 5173 | 3962 | 4962 | ||||||||
| SF2 Released not in SH2 | 156 | 143138 | 137 | 76 | 190180 | |||||||
| SF2 Released in SH2 not in PS1 | 116130 | 12084 | 13690 | 1021 | ||||||||
| SF3 Mods in SF2 not in SH2 | 34 | 34 | 35 | 35 | ||||||||
| SF3 Mods in SF2 SH2 not in PS1 | 0 | 0 | 0 | 311 |
See attached spreadsheets below for details.
SP2023 SP2024 Final Post Upgrade SH2-to-PS1 Transport List.xlsx
SP2023 Full SP2024 SF2-to-SH2 Transport List 20241204.xlsx
SP2023 SP2024 Open Transports 2023100620241004.xlsx
SP2023 SP2024 Open Transports 2023101320241011.xlsx
SP2023 SP2024 Open Transports 2023102020241018.xlsx
SP2023 SP2024 Open Transports 2023110620241104.xlsx