Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

6) Pressure calculations inside the tank (structures)

7) Define off-nominal pressure thresholds and determine the corresponding follow-up action items (how to control the pressure)


Not a lot of people showed up, so those that did, sent them to LEONIRD meeting as they are interested in both projects. In the meantime, I was able to gather a bunch of information from the other sub-teams to make sure we are integrating well with them.

  • Ellery getting extra stuff from Rocket Team we can use to test initial things on
  • T&M x Controls specific work is going to be testing all of our FDIR logic, Activation, & Fault Handling (reference software slides in their CoDR slideshow 20-23)
  • Data Management wants us to work on pressure off 
  • Talking to Masha about pressure sensor problem might be useful for us
  • Structures finalizing pressure valve system → we need to know how to control it (prob PID system here) (off-nominal values for pressure and action items to follow)