Equipment Booking
In order to ensure that you are able to use the equipment, please book it through this wiki page. Write your name and the time where you wish to use the microscope. Example: Name1 9am-12pm; Name2 1pm-4p
- Microscope 1
- Fluorescence, brightfield, phase contrast
- IPLab control
- Cooke PCO 1600 (CCD; 1600x1200 7.4 um pixels; 30 fps @ full frame, 50 fps binned 2x2)
(http://www.cookecorp.com/sensitive-cameras/pco1600/) - Nikon Zyla (CMOS 2560 x 2160 6.5 µm pixels)
- Hamamatsu Orca II (C4742-98-24 ERG; CCD; 1344x1024 6.45 um pixels; 5.6 fps in high-speed mode, 0.83 fps in high-precision mode @ full frame)
(http://sales.hamamatsu.com/assets/pdf/hpspdf/C4742-98-24ER.pdf) - Computer: Raid 0 harddrive.
- Microscope 2
- Fluorescence, brightfield, darkfield, phase contrast
- Nikon NIS-Elements control
- Andor iXon-885 (EMCCD; 1004x1002 8 um pixels; 30 fps @ full frame, 60 fps binned 2x2)
(http://www.andor.com/scientific_cameras/ixon_emccd_camera/)
- Microscope 3 - NO CAMERA COMPUTER CONTROL YET
- Brightfield, darkfield, phase contrast
- Nikon NIS-Elements control
- Andor Neo sCMOS (CMOS; 2560x2160 6.5 um pixels; 100 fps @ full frame, 400 fps @ 512x512528x512)
(http://www.andor.com/scientific_cameras/neo_scmos_camera/)
- Photron SA3 60K -High-Speed Camera
- Photron PFV software through gigabit ethernet connection (NOT controlled by IPLab or Nikon NIS-Elements)
- CMOS; 1024x1024 17 um pixels; 1000 fps @ full frame, 3000 fps @ 512x512
(http://www.photron.com/index.php?cmd=product_general&product_id=6&product_name=FASTCAM+SA3)
Syringe pump P = Harvard Apparatus Programmable; I/W = Infuse/Withdraw; (n): number of syringes
Nov 30 - Dec 6 | Scope 1 | Scope 2 | Scope 3 | Scope 4 | photron | pumpP | pump I/W | pump I/W | pump PicoPlus | hasp | |||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Mon 30 | Mehdi 11am-6pm |
|
| ||||||||||
Week of Sept 12-Sept 18 | Microscope 1 | Microscope 2 | Microscope 3 | Photron | Syringe Pump P (10) | Syringe Pump I/W (10) | Syringe Pump I/W (10) | Syringe Pump I (2) | |||||
Monday |
| Hongchul (all day) |
| Mehdi 11am-6pm |
| Hongchul (all day) |
| ||||||
Tue 1 | Mehdi 11am-6pm | Tuesday |
| Jeff All Day | Jeff All Day | Jeff All Day |
| Mehdi 11am-6pm | Jeff All Day |
|
| ||
Wed 2 | Cherry 1pm - 4pm | Wednesday |
| Jeff All Day | Jeff All Day | Jeff All Day |
|
| Jeff All Day |
|
| ||
Thu 3 | Mehdi 11am-6pm Gaston 6pm-10pm |
|
|
| Mehdi 11am-6pm Gaston 6pm-10pm | Thursday | Yutaka 3pm - 7 pm | Kwangmin 9am - 3 pm |
|
|
| ||
Fri 4 | Mehdi 11am-6pm |
|
| Friday | Steve (all day) |
| Mehdi 11am-6pm |
| Nicole (Ribbeck lab) o/n-3pm |
| Steve (all day) | ||
Sat 5 | Gaston 12pm-8pm Hongchul 4pm-o/n |
| Saturday |
| Gaston 12pm-8pm | Hongchul (all day) |
|
| Hongchul (all day) | ||||
Sun 6 (LAST DAY to do experiments) | Gaston 12am-8pm |
| Sunday | Hongchul (all day) | Gaston 12am-8pm |
|
| Hongchul (all day) |
| Scope | Week of Sept 19- Sept 26 | Microscope 1 | Microscope Scope 2 | Microscope Scope 3 | Scope 4 | Photron Camera | Syringe Pump P (10) | photron | pumpP | pump Syringe Pump I/W (10)Syringe Pump | pump I/W (10) | Syringe Pump I (2) | pump PicoPlus | hasp | |||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Mon | Do Not Use This Table |
|
|
|
|
|
| Monday | Steve (all day) | Hongchul (all day) |
| Steve (all day) | ||||||
Tue | Copy and Paste Only | Hongchul (all day) |
|
|
|
|
|
| ||||||||||
Wed |
|
| Tuesday | Steve (to 4pm) | Kwangmin 2pm-7pm |
|
| Steve (to 4pm) |
|
| Wednesday | Yutaka 9am-7pm | Nicole (Ribbeck lab) |
|
|
| ||
Thu |
|
|
|
| Thursday |
| Kwangmin 9am-7pm |
| ||||||||||
Fri | Kwangmin 9am-7pm |
|
| Friday | Kwangmin 9am-7pm |
|
| Hongchul 1pm- o/n |
| Kwangmin 9am-7pm |
| |||||||
Sat Hongchul 1pm- o/n |
|
| Saturday | Hongchul (all day) |
|
| Hongchul (all day) |
| ||||||||||
Sun |
| Sunday | Hongchul (all day) |
|
|
| Hongchul (all day) |
|