...
The transport tracking goal is to move as much pending work to production as possible before the 10/22/2012 production freeze. The instructions for how to create this report can be found in Tech Service Team Wiki.
Transport status | # of Transports | # of Transports | # of Transports | # of Transports | # of Transports | Comments | |
|---|---|---|---|---|---|---|---|
SF2 transports not released | 365 | 350 | 323 | 310 xxx | 308 | 9 10 Do not transport | |
SF2 Released not in SH1 | 353 | 292 | 205 | xxx 76 xxx | 56 | 74 7 Do not transport | |
SF2 Released in SH1 not in PS1 | 111 | 110 | 112 | 31 xxx | xxx | 36 | 8 2012 SP 7 Do not transport |
SF3 Mods in SF2 not in SH1 | 31 | 31 | 31 | 41 xxx | 46 | 0 2012 15 2012 SP | |
SF3 Mods in SF2 SH1 not in PS1 | 10 | 10 | 11 | 12 xxx | 10 | 0 2012 SP |
See attached spreadsheet below for details.
...