- If necessary, revert each development object to be changed to the version currently in Production. In-process changes should be saved as a non-transportable copy of the object, as a downloaded text file, or as a printed listing.
- Change the development object(s) to implement the required fix.
- Perform unit testing in SF2.
- Release the transport(s) once unit tested
- Execute ZUTTREQ making sure SH2 is the 'To' environment
- Enter the transport(s) into the Transport # Sequence field within the SP 2015 2016 ticket
- During SIT, transport the fix to SH2 and test to confirm the efficacy of the fix.
...
What to do in ZUTTREQ:
Check 'Critical' and 'To' environment as SH1 -> SH1 (Prod path); SF2 -> SH2 (SP path). After approval, the R3 Admin team (r3-chmgt@mit.edu) will move the transport(s) to SH1 SE1/PS1 and SH2.
Ongoing Projects with planned install in Production with Support Pack Go Live
TBD (Will require regression testing in SH2 & SH2 /HANA to confirm proper functioning with support packs.)
...