Construction of the antenna foundation and tower to be completed by June, with observations starting before the end of this year.

VGOS system will be 16 Gbps, cover 2.7 to 15.5 GHz with 1 GHz bandwidths.

Guangli - 13 Feb Guangli - 28 Jan 2016

AuScope (Hobart, Katherine and Yarragadee)

...

Currently a prototype receiver is under revision and testing at Callisto. Progressing well. Recently some feed beam pattern measurements have been made to assess the impact of the vacuum window.

A DBBC3 has arrived at Hobart and is installed. Successful tests at 16 Gbps.

S/X mixed-mode observations possible with Hobart 12m. Fringe tests with existing DBBC2s and SX at 2 Gbps successful (Hobart-Yarragadee).

Jim Lovell - 27 Jan 23 Feb 2016

Kashima 34m

We are doing broadband VLBI experiment with our stations(kashima34, Marble1,Marble2) for frequency comparison. We are planning exchange the dish of small antenna from 1.5m/1.6m to 2.4m to improve sensitivity.

...