Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. W AL paper, Bernd, ver 3.0
  2. W x-section paper
    1. absolute lumi, Ross
    2. M-C simu: Justin, Jan
    3. preliminary paper outline / motivation issues: Scott
    4. preliminary SN outline: Justin
    5. Willie resumed work on absolute BSMD calib based on run 9, we talk a lot, got air pressure values from Oleksandr, plot
    6. more ...
  3. Preparation for run 11:
    1. TPC working point for pp500 in run 11 Gene
  4. AOB

...