You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Current »

 Disaster Recovery Test Plan Task List

The SAP disaster recovery test on Saturday, December 14 2019 will include:

Verification involving Failover and subsequent Failback of:

  • ERP system PS1
  • GRC system ACP
  • NetWeaver/ADS system DSP
  • SAP Mobile system SMP with SAP Load Balancer hecsmpweb01.hec.mit.edu
  • OpenText (HDB) system OTP
  • DataMart systems DMP and DS1
  • Cloud Connector system HCC

and including the DR site IaaS servers

  • OTP application server (vhmitotpai01)
  • SFTP (vhmitftp02)
  • BSP (vhmitbspdb03)
  • No labels