Transport Statistics
(See attached spreadsheet for details (under construction))
Transport status |
# of Transports |
# of Transports |
# of Transports |
Comments |
|---|---|---|---|---|
SF2 transports not released |
447 |
|
|
|
SF2 transports released not in SF5 |
261 |
|
|
|
SF2 transports in SF5 not in PS1 |
101 |
|
|
|
SF3 transports in transports in SF2 not in SF5 |
19 |
|
|
|
SF3 transports in SF5 not in PS1 |
12 |
|
|
|
The transport tracking goal is to move as much pending work to production as possible before the 11/10/2010 production freeze.
The transport request utility, ZUTTREQ, will be temporarily modified to send all requests to the Transport Coordinator. The coordinator will use this information to update the tracking spreadsheet and kept the statistics up-to-date.
For the duration of the development freeze (11/1/2010-12/15/2010), a special development process should be used for development of fixes to SAP. The aim of this process is to avoid the introduction of non-support pack changes into the Support Pack test system (SH3) or the Production system (PS1).
The following are the steps in the special development process. Questions about this process should be directed to John Tuttle, Transport Coordinator at jrtuttle@mit.edu or 617-324-0097.