You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 60 Next »

Tasks labeled with different letters are in principle independent and can be pursued in parallel.

Label

Task

InCharge

Dependency

Milestones

Status

TargetDate

Remarks

A1

TPC calibration

Joe

*when calib is good enough?\\*run test prod of 1 daq file per run\\*request full official production

eval effi at CM

A2

electron reco effi

Justin

*TPC calib\\ *Embedding

*study effic uniformity vs eta, phi \\ *tracking effic after final calib (tracks crossing CM?)

B1

simu , simple Pythia

Jan

*ETOW slow simu in BFC

*repeat simu of all types of events

DONE, private production

Finished: 8/17/2010

table below, more W->tau have be added

B2

simu w/ embedding

Jan & Joe

*simple simu as reference\\ *TPC calib

* approval of W embedding\\*one 40 GeV ET electron embedded correctly\\*private 1K various Pythia events\\ *full suit of Pythia events embedded officialy

Jan focus on code, Joe on approvals \\*redo time stamp list

C

abs. BTOW calib

Justin +TBD?

*TPC calib\\ *Pythia simu \\ *single ele MC

*Leakage study from simu\\ *E/p from high ET electrons

single ele MC produced -> studying leakage

Leakage study by 8/23

*study linearity? \\ *why E/P~1 for QCD bckg \\ *use BSMD?

D

abs. luminosity

Ross

none

*f(old)>f(new)>f(perfect) \\ *stable fit \\ *updated starnote

first milestone done -- 20%,5%,~2%. \\*First milestone broken, then fixed: 25%>10%>(<1%). Propagating changes through the note.

*fit function working by 8/3 (need ~1 more day) \\ *starnote updated by 8/10

E

write paper

Joe & Scott

none

*draft detailed outline\\ *decide on figures

outline available by 8/9

should paper include spin-dependent issues?

F

write STAR Note

Justin

none

*preliminary outline

preliminary outline by 8/10

  • No labels