ISR simulation tools

Run simulations of the existing Svalbard ISR

Run simulations of the Svalbard fixed with 2x the diameter

Create a new radar by giving the Svalbard fixed radar twice the diameter. To do this, you will need to know the following parameters about the Svalbard fixed ISR:

Determine how many seconds you can reduce the integration period to and still have less than 5% error at all times at altitudes of:

With an integration time of ten seconds and all the parameters as above except peak power, how much do you need to set the peak power to to get a 5% error at 500 km?

Now change the elevation at 10 degrees (its a virtual Jicamarca radar, after all!). What is the integration time to have less than 5% error at all times at 1000 km altitude?