Choose the Millstone Misa ISR in single pulse 480 microsecond mode.
Run for 24 hours during Jan. 1st using 240 seconds of integration at 90 degrees elevation.
Determine how many seconds you can reduce the integration period to and still have less than 10% error at all times at 750 km altitude.
Describe what happens when the integration period gets short (1 second).
The idea of this exercise is to build a low power version of the Millstone zenith antenna that can make a measurement every 5 minutes. To do this, use the Simulate a new ISR tool. Use the present zenith antenna which has the following characteristics:
Freq: 440E6 Hz
Diameter: 68 m
Pulse length: 480.0E-6 seconds
0.05 duty cycle
88 degree elevation
Determine how low peak power you can use to get 10% error at 500 km at 5 minutes integration across the entire day on Jan 1st..