Overview
The payload for the Space Shot engages with the local community and collects data on the rocket flight. See data types in requirements below.
Primary scope items include a multi-faceted Data Acquisiton Package and an outreach payload with mass and local collection of signages to send beyond the Karman Line.
Requirements (as of 9/23/2018, not firm)
Outreach Payload
- Cargo and enclosure
- Post cards
- SD card
- Screen for altitude and photo file display
- Camera
- Must have view of at least the post cards and SD card
- Hardware Form Factor
- Fits 4" airframe diameter
- Concentric frame
- Structures for bulkhead attachment
- Operational
- 2 hours of on-pad life
- Battery
- Altimeter alerts for target altitude
Instrumentation Package
- Data Type
- Temperature
- at least 1 under NC tip, at least 4 on surface
- at least 2 on the cylindrical walls
- Thermocouples must operate at >800K (930 F)
- Load
- Load cells on chutes
- Strain gauges on tubes
- Accelerometer
- Pyxida's IMU mounted on payload frame
- Vibrations
- Airframe (region near NC)
- Piezoelectric based sensor mounted on payload frame
- Spine Axial Load Experiment
- Fabric sensors or alternative
- Fin Deflection (Fin Flutter PT. 2)
- 1 Camera for each fin, mounted on payload frame
- Data Rate & Storage
- Temperature 10-100Hz
- at least 1 under NC tip, at least 4 on surface
- at least 2 on the cylindrical walls
- Load - 100 Hz
- Accelerometer - O(10kHz)
- Microphone
- Piezos
- etc.
- Hardware Form Factor
- Does not affect recovery system deployment
- Thermocouple map onto nose cone
- Interface w/ Structures for NC geometry
- Length limit 10"
- Set by NC space for 1st-stage only descope
- TBD architecture of S2 with IP
- Operational
- 2 hours of on-pad life
- Data Storage
- Thermal
- Battery life
- Acceptable sensor drift
- Remote Arming via Pyxida
- Relay data to Pyxida
- Integration time < 1/2 hour
Tests Based on Requirements
Requirement 1:
- Bench test w/ sensors running
- Life test: 2 hrs. of "on pad" simulated with hardware
- Data Storage
- Thermal
- Battery life
- Acceptable sensor drift
- Remote Arming
Requirement 2:
- Bench test & life test (see req. 1)
Requirement 3:
Requirement 4:
- Life test (see req. 1)
- CRIMP