Tools:
Materials:

 

 

 

 

 

 

 

 

Procedures:
  1. Prepare the following sub- assemblies before dressing:
    1. battery holder square
    2. middle square with DAQ mounted
    3. solder power on screw switch
  2. Run power wires through the top square to bottom square
  3. Mount battery holder square first, pick up power wires
  4. Connect power to battery, mount middle square
  5. Run antenna cable through the middle square
  6. Mount antennae (2) to the top square
  7. Mount top square
  8. Mount screw switch
  9. Add nuts on top plate
    1. Take checkout photo of full assembly
  10. Get batteries
  11. Prepare nose cone TCs in tip (if not already made)
    1. Take checkout photo of DAQ -> TC attachment
  12. Silde on nose cone and bolt in place