Resources
- CAD: in SVN
- Derivations: wiki
- Code: SVN
- Analysis: SVN
- (add links to above)
1/7 PROGRESS
TASKS AS FOUND AT BEGINNING OF IAP
Drag test
- index steel disc (challenging since it doesn't fit in the indexer)
- make 1/4-20 threads on aluminum tube into through holes for grub screws
- snag grub screws
- weld steel disc to steel plate
- fit check entire stand
- fit load application sandwich with clevis on instron
- verify test load derivation and analysis
- write test procedures
- manage instrumentation and documentation of test
- run test
Moment test
- fix base jig holes (10" apart now, need to be 11" apart)
- confirm fit on instron
- work with pierce to coordinate 3 point bend fixture use
- verify test load derivation and analysis
- write test procedures
- manage instrumentation and documentation of test
- run test
ACCOMPLISHMENTS
- made 1/4-20 threads on aluminum tube into through holes for grub screws
- snagged grub screws
- preliminary fit check of moment test hardware
- fixed base jig holes with waterjet (thanks Todd!)
- found load application sandwich in the Deep
- reached out to Pierce for help with 3 pt bend fixture and clevis fitting
- reached out to Seth for welding help since Charlie is gone
- came up with steel disc indexing plan with Todd
RISKS/MITIGATIONS
- worried that 3 point bend fixture won't work with the whole setup (sort of worrying, this could really set us back)
- will continue to chase down Pierce
- bars might have to be elongated
- worst case scenario we may be able to sandwich with a steel plate and compression bar
- worried that load application sandwich + clevis won't work with the whole setup
- will continue to chase down Pierce and make necessary modifications
- a little rusty on the loads derivation and analysis
- will set aside a few hours to go over this today
PLAN/MILESTONES
- 1/8
- bore and index steel disc with Todd
- weld with Seth if I can find him
- meet with Pierce if I can find him
- work on documentation and test procedures
- GOAL (unless blockers come up): finish and fit check all hardware
- 1/9-1/10
- update documentation
- perform initial proof testing with limited instrumentation
- 1/10-1/12
- shannon is in NYC visiting a friend
- 1/13+
- refine testing and really nail it all down