Black Powder Piston Capsule Test

Conducted by: Jack A (484-502-8924), Claire J

Location: Blast Chamber

Date: 05/02/23

Time: 1830-2030

 

Safety Precautions:

Goals:

Materials:

Tools:

Hardware:

Consumables:

Procedures:

Check-offs:

Black powder capsule integration procedure (24 hours before):

Hydrostatic Testing Procedure:

Piston Integration Procedures: 

Black Powder Capsule Testing Procedures: