| Deliverable | Requirements |
|---|
| Tank Pressurization |
|
| Passes all environmental tests | (delegate to testing/manufacturing as well) |
| Thermal Control MLI (Multi-Layer Insulation) | (delegate to testing/manufacturing as well) |
| Mounts to Oligo |
|
| Structural Stability (delegate spill-off test) |
| Preventing Spill-off | Having a redundant system to catch spills |
| Baffle Integrity | The baffles shall not deform |
| MLI (Multi-Layer Insulation) |
|
| Determine all physical properties | All physical properties shall be known to scale (mass, inertial matrix, rotational inertia generated) |
| Safety Lock |
|
|
|
|
|
|
|