Tasks labeled with different letters are in principle independent and can be pursued in parallel.

Label

Task

InCharge

Dependency

Milestones

Status

TargetDate

Remarks

A1

TPC calibration

Joe

*when calib is good enough?\\*run test prod of 1 daq file per run\\*request full official production

eval effi at CM

A2

electron reco effi

Justin

*TPC calib\\ *Embedding

*study effic uniformity vs eta, phi \\ *tracking effic after final calib (tracks crossing CM?)

B1

simu , simple Pythia

Jan

*ETOW slow simu in BFC

*private 2K events per sample

*EEMC Slow Simu by 8/6\\82K eve by 8/11

private production?

B2

simu w/ embedding

Jan & Joe

*simple simu as reference\\ *TPC calib

*one 40 GeV ET electron embedded correctly\\*private 1K various Pythia events\\ *full suit of Pythia events embedded officialy

Jan focus on code, Joe on approvals \\*redo time stamp list

C

abs. BTOW calib

Justin +TBD?

*TPC calib\\ *Pythia simu \\ *single ele MC?

*Leakage study from simu\\ *E/p from high ET electrons

*study linearity? \\ *why E/P~1 for QCD bckg \\ *use BSMD?

D

abs. luminosity

Ross

none

E

write paper

Joe & Scott

none

F

write STAR Note

Justin

none

*preliminary outline

preliminary outline by 8/10