Transport Statistics


The transport tracking goal is to move as much pending work to production as soon as possible, before the 5:00 pm 10/20/2024 production restricted window (the instructions for how to derive the details for the table below can be found by following the Transport Coordinator Instructions & Audit Process link on previous page in project Wiki).

 

Transport status

 


# of Transports as of 10/04/24


# of Transports as of 10/11/24


# of Transports as of 10/18/2024


# of Transports as of 10/25/2024


# of Transports POST GO-LIVE as of


Comments

SF2 transports not released847362


SF2 Released not in SH2156138137


SF2 Released in SH2 not in PS11308490


SF3 Mods in SF2 not in SH2445


SF3 Mods in SF2 SH2 not in PS1 000


See attached spreadsheets below for details.

SP2024 Open Transports 20241004.xlsx

SP2024 Open Transports 20241011.xlsx

SP2024 Open Transports 20241018.xlsx