You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

“Well if the chutes don’t open, what’s the point?”

---- Ken Mattingly, Apollo 13

Making chutes can either be one of the quickest or longest phases of making a rocket, depending on the complexity. To compete in the Advanced Category of IREC (as of Aug. 2016), making a chute is required. Below we detail how the chutes, deployment bag, and risers for Therion were made.

Kelly! Zach! Help!

Planning geometry

 Many different geometries for parachutes can be used, such as a semi-ellipsoidal geometry, which was the geometry used for IREC 2016. Any cross section of a semi-ellipsoidal (often just referred to as ellipsoidal) parachute is half of an ellipse, and the entire surface is defined by rotating that ellipse around it's central axis.

Cutting the gores

 

Assembling the gores

 

#somanyshroudlines

 

Deployment Bag for Parafoil

 

Risers

The risers were made of 1” REI climbing rope, rated to 22 kN. The ends were sewn in a “box and X” pattern as shown, leaving a small loop for the quicklink to attach to.

 

Shielding

Something about Nomex shielding…




  • No labels