RISG agenda, Wed., 9/17/08: 10-11:45; Rotch Conference Room
- Announcements (15 mins.)
- Brainstorm possible projects & prioritize for big picture (20 mins.)
- Revisit Reference Vision (Lisa) (30 mins.?)
- Homework for group: go over the document again.
- Continue the discussion about where we fall short.
- Take a serious look again at the vision itself and how to update it for 2008.
Minutes: Helman (next: Locknar)
Possible meeting topics for the future:
- Lisa shows us how to use Zoomerang.
- Ask Us Page - currently, the information is presented in terms of how the user wants to get in touch with us. Should we revise this so that emphasis is on subject selector page?
Goals for FY2009:
Done? |
Timeline |
recurring |
Project |
Who's working on it? |
---|---|---|---|---|
DONE! |
September 2008 |
yes |
Select IAP coordinator team |
Remlee will put out call; Angie will help write call and make sure new team has wisdom from previous years |
in process |
By end of Oct. 2008 |
yes |
Review & maintain video tutorials |
Angie organizes, with help reviewing & updating |
|
Discuss in Sept. 2008 |
yes |
Think more broadly about reference (and instruction) in general & where are we in the Reference Vision plan? Already talked about what was and what have now; next steps write new vision for future; instruction assessment group talked about doing something similar with instruction; should RISG keep as separate streams or collapse together; "reference" vision actually "public service" vision. |
Lisa H. spearhead |
|
By end of Fall 2008 |
yes |
Plan Spring Seminar. Brainstorm research and instruction-related topic, find someone to do it, figure out if it will cost money. For staff development. |
Heather & Lisa H. (will bring in ideas from instruction assessment) |
beginning is done; project ongoing |
Fall 2008 |
|
Video tutorials assessment - we'll have the analysis back from Patty at some point in the spring. Have pilot assessments, but then what? Report written by Patty and Darcy; RISG is supposed to continue to evaluate?; writing in annual reports - no one included; Should there be a rotating "video coordinator" position in RISG? Angie already does for many things; Darcy oversees technical side - Angie and Darcy have been coordinating; only data collected is from Google Analytics. Sitting in awareness, satisfaction, importance space. Should it be up to instruction coordinators to report out on? Where is steve getting numbers from? |
Angie, Georgiana |
|
Fall 2008-June 2008 |
|
Consider sampling system for stats. Check with Steve/Nina/Sands about using same coding from instruction statistics form for reference (at and away from desk statistics). Lisa will talk to Steve about using GIS stat webform as example. |
Lisa H. leads, with Heather, Remlee, Lisa S., Bill? |
|
By beginning of Fall 2008; will talk about Fall 08 results in Jan/Feb but continue pilot for 1 year |
|
Pilot assessment of student learning. We need to have something in place by the beginning of the next academic year. (will be informed by IAP instruction assessment survey data) |
Angie leads, with Mark & Lisa H |
|
Start Sept. 2008; revision will be complete Jan. 2009; instruction plan timeline determines dates |
|
Instruction Toolkit - think about when and who? The project plan (implementation of instruction plan) will address this, so we'll need to think about what is realistic. Nicole created a wikispace but it's not populated yet; linked from RISG wiki under projects and documents. Can start with existing instruction toolkit on wiki. http://libstaff.mit.edu/instruction/toolkit/bibliography.html |
|
|
Start Oct. 2008 |
|
Think more broadly about Barton Basics changes and enhancements in light of the new world of searching (Vera Multi-Search, WorldCat Local). |
|
|
End of Fall 2008 |
|
LibGuides vs subject guides assessment: assess research guides; some subject guides were just a listing of things from Vera, but many were much more extensive; make clear that subject guide doesn't have to look like database listing; make sure subject guide person knows they can control link from main library page to real subject guide and then link to LibGuide from subject guide |
Lisa H. leads |
|
End of Fall 2008 |
|
Review instruction plan and implementation |
|
|
Spring 2009 |
|
Establish list that lays out ownership of certain projects (virtual reference pages, instruction pages, wiki, etc) |
|
|
Spring 2009 |
yes |
Review & maintain Barton Basics, information navigator, tutorials, etc. |
|
|
Spring 2009 |
yes |
Review & maintain reference manual |
|
|
Spring 2009 |
|
Review instruction assessment tools - are the stats being gathered still relevant for what we want? |
|
|
2009, after we have more survey results |
|
Work to promote user awareness of research guides, maybe with CFG, as described in assessment project plan for 2007-2010. Use user awareness survey info. |
|
|
June 2009 |
yes |
Reference statistics (need to be done by middle of spring to be ready for next fiscal year) |
|
|
June 2009 |
yes |
Call for new members (every year/through PSLG) |
|
Brainstormed ideas to consider to add to the timeline:
- Think about how we could facilitate sharing what is learned at conferences and other events with colleagues. Is this feasible or even desirable to do?
- Improve the live capture in DIRC: ok to have short shelf life; things we can do to improve quality? Low cost? Link to them in more locations? Statistics?