Equipment Booking
In order to ensure that you are able to use the equipment, please book it through this wiki page. Write your name and the time where you wish to use the microscope. Example: Name1 9am-12pm; Name2 1pm-4p
- Microscope 1
- Fluorescence, brightfield, phase contrast
- IPLab control
- Cooke PCO 1600 (CCD; 1600x1200 7.4 um pixels; 30 fps @ full frame, 50 fps binned 2x2)
(http://www.cookecorp.com/sensitive-cameras/pco1600/) - Hamamatsu Orca II (C4742-98-24 ERG; CCD; 1344x1024 6.45 um pixels; 5.6 fps in high-speed mode, 0.83 fps in high-precision mode @ full frame)
(http://sales.hamamatsu.com/assets/pdf/hpspdf/C4742-98-24ER.pdf)
- Microscope 2
- Fluorescence, brightfield, darkfield, phase contrast
- Nikon NIS-Elements control
- Andor iXon-885 (EMCCD; 1004x1002 8 um pixels; 30 fps @ full frame, 60 fps binned 2x2)
(http://www.andor.com/scientific_cameras/ixon_emccd_camera/)
- Microscope 3 - NO CAMERA CONTROL on scope 3; scope 1 computer can control Andor Neo
- Brightfield, darkfield, phase contrast
- Nikon NIS-Elements control
- Andor Neo sCMOS (CMOS; 2560x2160 6.5 um pixels; 100 fps @ full frame, 400 fps @ 528x512)
(http://www.andor.com/scientific_cameras/neo_scmos_camera/)
- Photron SA3 60K -High-Speed Camera
- Photron PFV software through gigabit ethernet connection (NOT controlled by IPLab or Nikon NIS-Elements)
- CMOS; 1024x1024 17 um pixels; 1000 fps @ full frame, 3000 fps @ 512x512
(http://www.photron.com/index.php?cmd=product_general&product_id=6&product_name=FASTCAM+SA3)
Syringe pump P = Harvard Apparatus Programmable; I/W = Infuse/Withdraw; (n): number of syringes
Week of Jan 9 - Jan 15 |
Scope 1 |
Scope 2 |
Scope 3 |
Photron Camera |
Syringe Pump P (10) |
Syringe Pump I/W (10) |
Syringe Pump I/W (10) |
Syringe Pump 1 (2) |
---|---|---|---|---|---|---|---|---|
Monday Jan 9 |
Yutaka 10am-9pm |
Jibo 11am-6pm |
|
|
Jibo 11am-6pm |
Jibo 11am-6pm |
|
|
Tuesday |
Yutaka 10am-9pm |
Hongchul -3pm, Jibo 3:30pm-8pm |
|
|
Hongchul 3pm, Jibo 3:30pm-8pm |
Yutaka 10am-3pm |
|
|
Wed |
Dan Prender 9am-1pm Yutaka 1pm-7pm |
Hongchul 9am-8pm |
|
|
Hongchul 9am-8pm |
Yutaka 10am-3pm |
|
|
Thurs |
Yutaka 10am-9pm |
Hongchul 9am-8pm |
|
|
Hongchul 9am-8pm |
|
|
|
Fri |
|
Hongchul 9am-8pm |
|
|
Hongchul 9am-8pm |
|
|
|
Sat |
|
|
|
|
|
|
|
|
Sunday Jan 15 |
|
|
|
|
|
|
|
|
Week of Jan 16- Jan 22 |
Scope 1 |
Scope 2 |
Scope 3 |
Photron Camera |
Syringe Pump P (10) |
Syringe Pump I/W (10) |
Syringe Pump I/W (10) |
Syringe Pump 1 (2) |
---|---|---|---|---|---|---|---|---|
Monday Jan 16 |
|
Steve 9pm-o/n |
|
|
Steve 9pm-o/n |
|
|
|
Tuesday |
|
Steve o/n-11pm |
|
|
Steve o/n-11pm |
|
|
|
Wed |
|
Hongchul 9am-8pm |
|
|
Hongchul 9am-8pm |
|
|
|
Thurs |
|
Hongchul 9am-8pm |
|
|
Hongchul 9am-8pm |
|
|
|
Fri |
|
|
|
|
|
|
|
|
Sat |
Steve 9am-12noon |
Steve 9am-12noon |
|
|
Steve 9am-12noon |
|
|
|
Sunday Jan 22 |
|
|
|
|
|
|
|
|