This report is designed for program and project managers, CC directors and accounting. It is made to show how close a project is to it's completion date, or how late it is running, using a visual representation. This report relies upon timely, accurate updates to the project schedule module, project management update status (PMUa process), and project details page.
Why is This Useful
This report gives a visual representation of the time a project has until it needs to be complete (according to the schedule the PM entered in eB), and or, how late it is running. If a project has been late for a long time, it is shown as red in this report. This could indicate that the project's completion has not been indicated in the system.
Components
For each project on the report, the project number, status and manager are listed, along with the program manager, primary and secondary cost objects, and a description of the project. The finish date is given as well, with the days until the finish date. To either side of the finish date are empty spaces that are filled in with colored squares based on the number of days from the completion date.
Sample Image
Image taken 1/9/2018