April 2, 2010
Present Ann, Kate, Peter, Ranjani, Molly, Kris (remotely)

1.) Discuss Ranjani and Kate's layout
Discussion about whether Video Conferencing and Distance Education _should_ have buttons.

Record, Edit, Share, Watch. (add edit)

"When I click on 'share' it takes me to the 'deliver' point. " Confusion about the words. Could it be "share",

"deliver", etc. Kris says to elucidate briefly what the word means.

Usability tests will helps us with this, too. Good to do this earlier rather than later. There is a group in IS&T and also a group in the LIbraries. Should try to schedule either in advance. (Neither of these services charge us)

"Jump to" will go to a drop down list. (Tech TV, AV Services, AMPS, etc.) More specific like: "edit a file", "rent equipment", who to schedule a room for a shoot", in TechTv, people ask 'how to edit', 'how do you capture', 'what are compression settings'.

Link to generalized standards document and then for specific hosts shoot them to a specific page.

2.) Copyright issues

Kris: there are some resources online about this, my blog entry. We need to link to resources. Explain what TechTv does for screening.

3.) Javascript randomizer

If you go to AMPS page,its randomized by refresh of the page. Can be randomizes between anything, it can be TechTv, the videos can come from AMPS video server, DVD, anywhere. Very cool!

4.) Implementation Questions.

a.) Prepare for usability testing. Basic html. For the test, how much content needs to be written and required. Kate: for usability, build the first one, and then build a complete path.

b.)Where do we host this? We agreed that we don't want it to be hosted at IS&T. If we want it to look like Teaching with Technology. We agree we want to host it there.

c.) Black out periods for the team: 

Kate: May 17-31; Ann: 1st week in July; Molly: June 20-Jul5; Peter: May 15-June 6; Kris: May 1-15; Elaine May 13th, June 1- 11th.

5.) Milestones:

Wireframe/html: front page, 1 or more completed paths. (1-3 weeks) Ranjani, Peter, Molly

Content creation (3 weeks) Kate, Kris, Elaine

Usability Testing (1.5 weeks) IS&T Micheal and Christine

Process UT fixes (2 weeks) Ranjani, Peter, Molly

Build out site (4 weeks) everybody

6.) Timeline:

April1 - May 15

May 15 - June1

June 1 - 21

June 21 - July 21

July 21 - Aug 1

Wireframe/html
get ready for usability testing
Content creation

Usability Testing

process fixes from
Usability Testing

Build out the site

Final tweaks,
wiggle room