The transport tracking goal is to move as much pending work to production as possible before the 10/24/2011 production freeze.
Transport status  | 
 # of Transports   | 
 # of Transports   | 
 # of Transports   | 
Comments  | 
|---|---|---|---|---|
SF2 transports not released  | 
473  | 
467  | 
468  | 
164 Do not transport  | 
SF2 transports released not in SH2  | 
315  | 
 317   | 
320  | 
118 Do not transport  | 
SF2 transports in SH2 not in PS1  | 
142  | 
162  | 
59  | 
   7 Do not transport   | 
SF3 transports in SH2 not in SF5  | 
23  | 
23  | 
51  | 
 28 2011 SP   | 
SF3 transports in SH2 not in PS1  | 
0  | 
0  | 
1  | 
 1 2011 SP   | 
See attached spreadsheet below for details.
The transport request utility, ZUTTREQ, will be temporarily modified to send all requests to the Transport Coordinator. The coordinator will use this information to update the tracking spreadsheet and kept the statistics up-to-date.