The transport tracking goal is to move as much pending work to production as soon as possible, before the Monday 5:00 pm 10/20/2025 production restricted window (the instructions for how to derive the details for the table below can be found by following the Transport Coordinator Instructions & Audit Process link on previous page in project Wiki).
| Transport status | # of Transports as of 10/02/25 | # of Transports as of 10/10/25 | # of Transports as of 10/17/25 | # of Transports as of 10/31/25 | Comments |
| SF2 transports not released | 100 | 95 | 92 | 96 | |
| SF2 Released not in SH2 | 187 | 182 | 170 | 251 | |
| SF2 Released in SH2 not in PS1 | 136 | 128 | 131 | 16 | |
| SF3 Mods in SF2 not in SH2 | 4 | 4 | 4 | 4 | |
| SF3 Mods in SF2 SH2 not in PS1 | 9 | 9 | 9 | 6 |
See attached spreadsheets below for details.
SP2025 Open Transports 20251031.xlsx
SP2025 Open Transports 20251017.xlsx
SP2025 Open Transports 20251010.xlsx
SP2025 Open Transports 20251002.xlsx