Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Scope:

This page details large tests. This does not include incremental assemblies & practice for each subsystem, which people will need to do before the launch rehearsal. 

Test 1: Ground Test + CRIMP, 4/6

Required: 

  • Assembly checklists for guidance (should not be too rigorous, rely on training)
  • Verification checklists for rigorous checking of proper assembly (should be very simple and clear and have photos)
  • Flight team assignments

...

  • Completed Avionics + Recovery Ground Test without cameras
  • Refined packing lists 

Test 2: Launch Rehearsal, 4/13

Required: 

  • Verification checklists for rigorous checking of proper assembly (should be very simple and clear and have photos)
  • Flight team assignments

...

  • Log single point failure locations
  • Refine packing lists
    • Add missing tools & materials
    • Add missing flight parts
  • Log Assembly times
    • Overall start/finish
    • By subsystem
    • Final integration
  • "Wish List" for additional GSE
  • Practice rocket integration in hangar

Test 3: Launch Rehearsal, 4/20, 4/27 and/or 5/4

Scope: 

  1. Pack tools & GSE listed in assembly checklists
  2. Pre-charge cameras, payload, and ALL altimeter batteries
  3. Transport only those tools to the hangar
  4. Set up tables & test stand as "launch tower" on Briggs prior to transport (simulate "FAR")
  5. Assemble Hermes II in the hangar
    1. Log & acquire any missing tools/GSE
  6. Put in "Final Integration" state
  7. Transport to Briggs Field A with GSE, including test stand as "launch tower"
  8. Perform Integration & Prelaunch procedures (except igniter, incl. raising to vertical)
  9. Verify telemetry in launch ready configuration
  10. Perform "rocket take down" procedures 
  11. "Launch" with telemetry and video during a ground test
  12. Use recovery procedures to pick up & safe the rocket
  13. Transport back to lab
  14. Log all data

...

  • Loosely simulate launch environment
  • Allow extra tools to be obtained easily as long as they are logged 
  • Determine GSE needed for successful launch/recovery
  • Train flight team

Test 4: Launch Simulation, 5/12-13 (stretch goal)

Required:

  • GSE for packed configuration
  • Refined checklists from above tests
  • Pre-set, reasonable adverse conditions

...