  • Log times for: 
    • All subsystems' assembly
    • Integration & Prelaunch (separately, at each step if possible) 
    • Rocket take down
    • Pick up & safe the rocket
  • Assign some of the roles
  • Estimate time loss from tools/extra parts left behind
  • Loosely simulate launch environment
  • Determine additional tools/GSE needed for successful launch/recovery
  • Train flight team

Status:

  • Completed assembly of entire rocket 
    • Soft goods assembly very smooth
    • Identified need for more RE's on lower electronics and payload stack assembly
    • Identified assembly issues for AV bay camera (interference between battery & camera enclosures), and LE (interference with PTap and camera enclosure)
    • Identified DAQ switch alignment issue - very difficult to turn on the switch to arm DAQ
  • Completed prelaunch procedures 
    • Put rocket vertical (need 6.2" OD Test tube for pad ops people)
    • Not all cameras armed (1x LE camera was turned on, 1x inserted backwards?)
    • Armed all altimeters
      • Loose screw switch issue: TODO: add lock nuts to opposite end of screw switch
  • Performed ground test 
    • Successful separation of drogue
    • Uncovered wire pull issue, in work

Test 4: Launch Simulation, 5/12-13

...