Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Tools:
  •  Adjustable wrench
  •  Mutlimeter
  •  Small Screwdriver

...

 

 

  1. Prepare the following sub- assemblies vefore dressing:
    1. battery holder square
    2. middle square with DAQ mounted
    3. solder power on screw switch
  2. Run power wires through the top square to bottom square
  3. Mount battery holder square first, pick up power wires
  4. Connect power to battery, mount middle square
  5. Run antenna cable through the middle square
  6. Mount antennae (2) to the top square
  7. Mount top square
  8. Mount screw switch
  9. Add nuts on top plate
  10. Get batteries
  11. Prepare nose cone TCs in tip (if not already made)
  12. Silde on nose cone and bolt in place
Attach payload coupler to nose cone
  1. Obtain screws
  2. Torque them down

Attach payload stack to nose cone

Attach nose cone tip to nose cone (FIX THIS)

  1. Run thermocouples through washer
  2. Push washer in
  3. Screw on bolt

...