Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Payload - NC

    Hermes II Payload - NC Assembly Procedures

  2. AV Tower

  3. Soft Goods


  4. Lower Electronics

     


  5. MP Assembly

    Hermes II III Mission Package Assembly Procedures

Integration Order

Ideally, the piston, AV tower, and payload stack can be assembled in parallel and then each attached to the payload bulkhead. In parallel to this assemblage, the nosecone and mystery box can be integrated. Then the two groups would be integrated together with the soft goods and the fin can.