Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Table of Contents

Last Updated 7 May 2020

...

1.  Summary of Timing Calibrations on X-ray missions

 

 

Mission/InstrumentsScience Requirement Absolute TimeTiming System DesignTiming Calibration StatusIn-orbit Timing-Calibration TargetsReported IssuesReference
RequirementGoalGPS ReceiverClock Stability(Absolute Timing Precision)
RXTE/PCA (star)        
Chandra / ACIS        
Chandra / HRC        
XMM-Newton/EPIC-MOS        
XMM-Newtion/EPIC-PN        
INTEGRAL/SPI        
INTEGRAL/IBIS        
Swift/BAT        
Swift/XRT        

Suzaku/XIS(star)

        
Suzaku/HXD(star)        
NuSTAR/FPM   0.1 ms0.1 ms 

~5ms offset using
millisecond pulsars
(Lucien Kuiper)

 
Astrosat        
HXMT        
Hitomi/SXS,SXI,HXI,SGD(star)        
NICER        
eROSITA        
XRISM/Resolve (blue star)        
XRISM/Xtend (blue star)        

(star) Mission completed.

(blue star) Future Mission

 

 

...

2. In-orbit Timing Calibration Plan/Observations

2.1 Archive Data

2.1.1 List of Coordinated Observations useful for Timing
2.1.2 Reports

2.2 New Coordinated Observations

 

 

...

3. Studies on Timing

3.1 effects on timing products (power spec, light curve etc) by the detector’s behavior (dead time, grade selection of calorimeter etc)

 

 

...

4. Timing Tools, (with Statistic Group)

 

 

...

5. Notes