  • Teflon tape pressure transducer, set up load cell 

  • Tighten/untighten bolts of test stand as needed 

  • hit stakes into the ground

  • attach ratchet straps to test stand and stakes (don’t tighten)

  • Attach wires to DAQ in protective box 

  • Set up cameras

  • place motor in stand and attach transducers

  • tighten bolts as needed to secure motor

  • tighten ratchet straps 

  • Data test (checking that DAQ works)

 

 

 

 

 

 

 

 

 

Procedure:

Now, we will talk about the static firing procedures. This is a list of actions that must be followed in the following order:

...