Part
Component Status
Responsible Engineers
Booster CupManufacturing PrepManufactured

Nicole CDiego D. 2024, Christina N. 2024

Sustainer CupManufacturing Prep

Diego D. 2024, Christina N. 2024

Design

Requirements:

  1. Shall contain soft goods prior to separation
  2. Shall withstand separation loads
  3. Shall separate from the nose cone/staging cone

...

  1. Cut coupler tube to length on the horizontal bandsaw
  2. Sand faces to level
  3. Cut a piece of supporting material to go inside the cup while machining it
  4. Add holes with radial indexer (Note: *Note: add holes 0.3 inches from the side that has the better machine-finish)
    1. 12 holes equate to 3 1/3 turns for each hole on the 18-radius marker on the radial indexer in N-51
    2. Safety note: use air gun to blow away fiberglass dust as soon as each hole has been completed.
      Image Added
  5. Sand interior and exterior until slides smoothly into mission package tube