Transport

...

Tracking

...

The

...

goal

...

is

...

to

...

move

...

as

...

much

...

pending

...

work

...

to

...

production

...

as

...

possible

...

before

...

the

...

10/22/2009

...

production

...

freeze.

...

 

Statistics as of 10/05/2009

...

  • 331

...

  • UnReleased

...

  • in

...

  • Dev,

...

  • Not

...

  • in

...

  • Test

...

  • 201

...

  • Released

...

  • in

...

  • Dev,

...

  • Not

...

  • in

...

  • Test

...

  • 135

...

  • In

...

  • Test,

...

  • Not

...

  • in

...

  • Production

...

See

...

attached

...

spreadsheet

...

for

...

details.

...

It

...

will

...

be

...

updated

...

periodically.

...

The

...

ZUTTREQ

...

transport

...

request

...

utility

...

has

...

been

...

temporarily

...

modified

...

to

...

send

...

all

...

requests

...

to

...

the

...

Transport

...

Manager,

...

so

...

the

...

transport

...

spreadsheet

...

and

...

statistics

...

can

...

be

...

kept

...

up-to-date.

...

Development

...

Procedures

...

For

...

the

...

duration

...

of

...

the

...

development

...

freeze

...

(10/26/2009-12/28/2009),

...

a

...

special

...

development

...

process

...

should

...

be

...

used

...

for

...

development

...

of

...

fixes

...

to

...

SAP.

...

The

...

aim

...

of

...

this

...

process

...

is

...

to

...

avoid

...

the

...

introduction

...

of

...

non-support

...

pack

...

changes

...

into

...

the

...

Support

...

Pack

...

test

...

system

...

(SH2)

...

or

...

the

...

Production

...

system

...

(PS1).

...

The

...

following

...

are

...

the

...

steps

...

in

...

the

...

special

...

development

...

process.

...

Questions

...

about

...

this

...

process

...

should

...

be

...

directed

...

to

...

John

...

Tuttle,

...

Transport

...

Manager

...

at

...

jrtuttle@mit.edu

...

or

...

617-324-0097.

...

 Fixes for issues found during Unit Testing in SF2 or SIT/UAT

...

in

...

SH2

...

  1. If

...

  1. necessary,

...

  1. revert

...

  1. each

...

  1. development

...

  1. object

...

  1. to

...

  1. be

...

  1. changed

...

  1. to

...

  1. the

...

  1. version

...

  1. currently

...

  1. in

...

  1. Production.

...

  1. In-process

...

  1. changes

...

  1. should

...

  1. be

...

  1. saved

...

  1. as

...

  1. a

...

  1. non-transportable

...

  1. copy

...

  1. of

...

  1. the

...

  1. object,

...

  1. as

...

  1. a

...

  1. downloaded

...

  1. text

...

  1. file,

...

  1. or

...

  1. as

...

  1. a

...

  1. printed

...

  1. listing.

...

  1. Change

...

  1. the

...

  1. development

...

  1. object(s)

...

  1. to

...

  1. implement

...

  1. the

...

  1. required

...

  1. fix.

...

  1. Perform

...

  1. unit

...

  1. testing

...

  1. in

...

  1. SF2.

...

  1. During

...

  1. SIT

...

  1. and

...

  1. UAT,

...

  1. transport

...

  1. the

...

  1. fix

...

  1. to

...

  1. SH2

...

  1. and

...

  1. test

...

  1. to

...

  1. confirm

...

  1. the

...

  1. efficacy

...

  1. of

...

  1. the

...

  1. fix.

...

Note:

...

Any

...

in-process

...

changes

...

saved

...

during

...

step

...

1

...

will

...

need

...

to

...

be

...

manually

...

merged

...

into

...

the

...

corrected

...

objects

...

after

...

the

...

development

...

freeze.

...

Critical

...

fixes

...

for

...

issues

...

found

...

in

...

Production

...

Before

...

development

...

is

...

begun,

...

it

...

should

...

be

...

clear

...

the

...

business

...

owner

...

considers

...

this

...

change

...

critical

...

and

...

requires

...

an

...

immediate

...

fix.

...

  1. If

...

  1. necessary,

...

  1. revert

...

  1. each

...

  1. development

...

  1. object

...

  1. to

...

  1. be

...

  1. changed

...

  1. to

...

  1. the

...

  1. version

...

  1. currently

...

  1. in

...

  1. Production.

...

  1. In-process

...

  1. changes

...

  1. should

...

  1. be

...

  1. saved

...

  1. as

...

  1. a

...

  1. non-transportable

...

  1. copy

...

  1. of

...

  1. the

...

  1. object,

...

  1. as

...

  1. a

...

  1. downloaded

...

  1. text

...

  1. file,

...

  1. or

...

  1. as

...

  1. a

...

  1. printed

...

  1. listing.

...

  1. Change

...

  1. the

...

  1. development

...

  1. object(s)

...

  1. to

...

  1. implement

...

  1. the

...

  1. required

...

  1. fix.

...

  1. Perform

...

  1. unit

...

  1. testing

...

  1. in

...

  1. SF2.

...

  1. Transport

...

  1. the

...

  1. fix

...

  1. to

...

  1. SF5/SH1/SH2.

...

  1. Perform

...

  1. the

...

  1. usual

...

  1. regression

...

  1. and

...

  1. user-acceptance

...

  1. testing

...

  1. in

...

  1. SF5/SH1.

...

  1. Perform

...

  1. testing

...

  1. required

...

  1. to

...

  1. confirm

...

  1. the

...

  1. proper

...

  1. functioning

...

  1. of

...

  1. the

...

  1. fix

...

  1. in

...

  1. SH2.

...

  1. Obtain

...

  1. the

...

  1. required

...

  1. approvals.

...

  1. Transport

...

  1. the

...

  1. fix

...

  1. to

...

  1. Production.

...

Note:

...

Any

...

in-process

...

changes

...

saved

...

during

...

step

...

1

...

will

...

need

...

to

...

be

...

manually

...

merged

...

into

...

the

...

corrected

...

objects

...

after

...

the

...

development

...

freeze.

...

 Transport Procedures

For the duration of the development freeze a special transport procedure will be enforced for changes to SAP.
This section explains the approval process. It lists the necessary approvers and documentation, and what steps you need to take in ZUTREQ. Questions about this process should be directed to John Tuttle, Transport Manager at jrtuttle@mit.edu or 617-324-0097.

Two possible transport paths during the Support Pack Project

Critical fixes for issues found in Production