- If necessary, revert each development object to be changed to the version currently in Production. In-process changes should be saved as a non-transportable copy of the object, as a downloaded text file, or as a printed listing.
- Change the development object(s) to implement the required fix.
- Perform unit testing in SF2.
- Transport the fix to SH2 & SH1 (as part of SP application process).
- Perform the usual regression and user-acceptance testing in SF5/SH1SH2.
- Perform testing required to confirm the proper functioning of the fix in SH3SH1.
- Obtain the required approvals.
- Transport the fix to Production.
...
What to do in ZUTTREQ:
Check 'Critical' and 'To' environment as SF5SH2. After approval, Ron will move the transport(s) to SH2, and SH1.
Ongoing Projects with planned install in Production after the Freeze begins
Enterprise Learning 2.0.
Hourly Student Appointments
APR 2.0 (HR Transactions)None planned during this year's project.
Resumption of normal transport cycle
...