The transport tracking goal is to move as much pending work to production as soon as possible, before the Monday 5:00 pm 10/20/2024 2025 production restricted window (the instructions for how to derive the details for the table below can be found by following the Transport Coordinator Instructions & Audit Process link on previous page in project Wiki).
| Transport status | # of Transports as of 10/0402/2425 | # of Transports as of 10/1110/2425 | # of Transports as of 10/1817/202425 | # of Transports as of 1110/0431/202425 | Comments |
| SF2 transports not released | 84100 | 7395 | 629262 | 96 | |
| SF2 Released not in SH2 | 156187 | 138182 | 137170 | 180251 | |
| SF2 Released in SH2 not in PS1 | 130136 | 84128 | 90131 | 2116 | |
| SF3 Mods in SF2 not in SH2 | 4 | 4 | 545 | 4 | |
| SF3 Mods in SF2 SH2 not in PS1 | 090 | 9 | 09 | 116 |
See attached spreadsheets below for details.
SP2024 Final Post Upgrade SH2-to-PS1 Transport List.xlsx
SP2024 SF2-to-SH2 Transport List 20241204.xlsx
SP2024 Open Transports 20241004SP2025 Open Transports 20251031.xlsx
SP2024 SP2025 Open Transports 2024101120251017.xlsx
SP2024 SP2025 Open Transports 2024101820251010.xlsx
SP2024 SP2025 Open Transports 2024110420251002.xlsx