  •  Go-nogo
    • Full page of GO-NOGO that is very clear to see 
    • Is a checklist with checkboxes to fill and roles to call GO-NOGO for certain fields
    • Multiple copies of this page in large print
      • Launch attempt number: __ is a field
    • New Fields: 
      • Altimeter state at launch 
        • number of satellite
      • Temp/wind speed/direction at launch
      • Time & date
      • Some way to connect launch attempt with video files
        • Altimeter startup time
        • Camera startup time
        • Liftoff time (seconds)
  •  Tie roles in more distinctly throughout Launch Ops – Andrew
    • Train people for their roles at rehearsals 
    • Define windows of "useful roles" vs "free hands" 
      • MUST BE DONE BY: XYZ? i.e. Julia calls FAA
    • Ask Jakob & Julia
     

...

  • Make quality/consistency integration checklists better across subteams – Assign to teamleads, Andrew & Jamie verify
    •  ENFORCING CHECKOUT PHOTOS
      •  Assign a role for that & have a "Master Key" of checkout photos needed for flight
      •  Checkout photos are GO-NOGO criteria
    •  AVI: More detail on programming of altimeters on the integration checklist
    •  Prop & Struc: Torque spec on bolts, Torque stripe all bolts
    •  Keep checkout photos in bold
    •  Get rid of ambiguity (e.g. what does "Secure" mean? Pull test? Wobble test? ??)
  •  Pad Cameras - changes to Launch Ops
    • Identify Pad Cameras & order them (How much money do we have to do this???)
    • ID each camera and show where it should be placed
    • Enforce roles & train for roles
    • Add in Camera setup if necessary 
    • Add in "take photo of camera running with your phone" 
    • Identify when pad cameras should be turned on and someone from the Pad should signal when that time is
      • After altimeter & onboard camera startup complete
  •  Add in verbal walkthrough of integration checklists?
  •  Data Recovery
    • Checkout photos - see above
    • File management scheme: What do you name your files and where do they go so they can be found
    • Expand post-launch checklist - add in roles for all subsystems
      • Enforce roles!! Launch is not done until this is completed
  •  In the Event of...
    • Premature loss of control in flight, etc... proceed to ballistic recovery
    • Medical Emergency
    • Rocket otherwise becomes dangerous? 
    • Go over failure modes at the launch site before flight – add to preflight on-site meeting / safety review thing (in a Kahoot?) 
  •  Preflight Sims
    • Split into RasAero & Recovery Sims
    • Signatures for each one
    • Upload to file, filename?
  •  List Mission Critical items – USE INTEGRATION CHECKLISTS
    •  Which things do we NEED to fly? e.g. 3 cameras vs all 5 or otherwise
    •  Which things can we leave out?
  •  
    •  Continencies for each thing
     How To: use Transit spreadsheet - Jamie
    • Appendix with link & instructions
  •  Avionics
    •  Add in tables for Away team & Launch Line to review GO-NOGO parameters
      •  Choose GONOGO parameters - voltage limits, GPS Lock, Data Logging for Telemega
      •  Choose GO-NOGO parameters - Pyxida sensors - flight critical and science critical and not critical
      •  Define acceptable flight scenarios
        •  > 2 hours in window remaining, do all science-critical items
        •   < 2 hours in window remaining, only do flight-critical items so we can fly at all
    •  Replace "on loading to launch rail" to have Launch Line verify table completion 

...

  • Fixed-direction antenna – can be borrowed
  • Telephoto lens (95.2" parallax - likely 400mm-600mm needed) – need to be rented (~$100)
  • Power bank/generator – need to be rented (available at Home Depot)
  • Binoculars
  • Emergency radio
  • Survival supplies (food, water, shelter, first aid, etc.) -> for cold weather
  • Vehicles – off-road capability likely needed

Action Items:

  •  Contact FAR and BLM (760-384-5400) re. feasibility/permits

...

  •  Update Launch Ops accordingly
  •  Order hard drives for data recovery