Here is a graph of the effective drag of the drogue as felt by the mission package between 7k-8k meters:. This includes the drag on the mission package as well as influences from the fin can.

Here is a graph of the effective drag of the main as felt by the mission package:

Image Added

 

 

E-match voltage anomaly

Post flight data review notes abnormal voltage readings on Telemetrum apogee channel. Despite commanding an apogee event, the Telemetrum continued reading 4.2V across the channel for the remainder of flight. The e-match should register a significant increase in resistance within 10 mS of exceeding it's no-fire current of no fire current here. This suggests that the initiator misfired.  A fishbone analysis was conducted to classify the nature of the issue. Evidence collection is ongoing, however it appear probable that the Telemetrum e-match is internally shorted, either autogenously or to the piston.

...