Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • 1ES 0229+200 observed on Oct 8-10, 2021
    • 18.8 ks full frame exposure lost due to very bad background flaring
    • Analysis of 60 ks small window EPIC-pn exposure presented
    • can be modeled as an absorbed power law or cutoff power law
  • Combined analysis with simultaneous 95 ks NuSTAR observation
    • Fit improved with cutoff power law above 20 keV
    • New NUSTAR calibration (CALDB20211020) improves agreement between NuSTAR FPM modules
  • Analysis of joint XMM / NuSTAR observing campaign on the Crab was presented
    • Observations performed every ~6 months
  • Observations are used to create a correction functionfor EPIC-pn ARF
    • Correction function will be vetted with more observations (calculated using MCMC)
  • Analysis of joint observations of 3C 273 and 1ES 0229+200 indicate that EPIC-pn normalization is ~83% of (updated) NuSTAR FPMA
  • Calibration update for EPIC-pn is being developed
  • Power-law slope of 1ES 0229+200 will be evaluated with XMM-MOS+OM and Swift-XRT+UVOT data

 Discussion

  • It was noted that the new NuSTAR calibration appears to push the relative normalizations of XMM-pn and NuSTAR-FPM further apart
  • Need to be careful to use similar extraction regions in analysis of Crab observations for cross-calibration purposes 
    • (extended source so observations at different epochs = different roll can sample different areas of the remnant)
  • Chandra observations show spectral curvature 
    • however no improvement is seen when more complex models are used

 

Observation of 1ES 0229+200 with Astrosat - Sunil Chandra

  • 1ES 0229+200 is a faint source for Astrosat-SXT, 74 ks exposure obtained in 2021 August
  • Modeled as an absorbed power law
    • Excess above 5 keV may be due to background and features below 0.5 keV may be residual calibration artifacts
  • Astrosat-UVIT data is yet to be released
  • There is also a previous observation by Astrosat (that may not be available yet)

Actions:

  • Jamie Kennea - will contact Andy B. to see if Swift-XRT data for 1ES 0229+200 will be analyzed
  • Renee Ludlam - Will work with Felix F. on joint analysis of NICER observations of 1ES 0229+200 

 

The meeting concluded after a discussion about supporting IXPE in-flight calibration

  • Launch scheduled for Dec 9th, 2021
  • There are many coordinated observations approved for scientific programs with INTEGRAL, XMM-Newton, NuSTAR, etc.

 

 




...

2021 May 13th Working group meeting     

...