Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
PartComponent StatusResponsible Engineers
Booster CupIn DesignBen L. 2026 Ethan W. 2026

Requirements

  1. Shall contain soft goods prior to separation
  2. Shall withstand separation loads
  3. Shall separate from the nose cone/staging cone

...