Note
titleDRAFT

This is a draft project plan.

Overview

Debathena is slated to completely replace Athena 9 during Summer 2009 and Fall 2009. This includes not only the public clusters, but quickstations, dorm clusters, and private workstations. While some private workstations are used as "servers", any servers maintained by IS&T or in an IS&T co-lo are outside the scope of this project.

Status

  • Public cluster deployments completed, August 2008.
  • Quickstation, dorm cluster upgrades on track.

Areas of Concern

  • Public clusters
  • Podium/lectern workstations in selected classrooms: Outreach to faculty required
  • Quickstations: Debathena login process on -cluster machines is slower due to chroot. Possibly mitigation by ensuring all Quickstations are 755s or 760s.
  • Private workstations with local data storage: Documentation on data migration is required — there is no upgrade path from Athena 9 to Debathena, a reinstall is required.

Athena 9 EOL Options

  • Upgrade to Debathena
  • Continue running Athena 9.4 with no support

Action Items

(error) = Incomplete | (star) = In progress | (tick) = Complete

Task

Owner

Due

Status

Upgrade public clusters to Debathena

jdreed, hotline

30-AUG-09

(tick)

Determine quickstation hardware and identify machines for upgrade

jdreed

8-SEP-2009

(tick)

Upgrade remaining quickstations to Debathena

hotline

13-OCT-2009

(error)

Upgrade dorm cluster machines to Debathena

jdreed, RCCs

13-OCT-2009

(star)

Craft documentation for data migration

jdreed

13-OCT-2009

(error)

Outreach to private workstation owners

jdreed,othomas

(error)

Complete Debathena PWOG

jdreed

15-SEP-2009

(tick)

Ensure OLH documents are updated

jdreed,aurora

15-SEP-2009

(star)

Upgrade public clusters to Debathena

Upgrades completed, early August 2009.

Determine quickstation hardware and identify machines for upgrade

Host

Hardware

Athena Version

qsmuseum-1.mit.edu

HP dc5100

9.4.26

quick-11-copy.mit.edu

HP dc5100

9.4.26

qsw32-1.mit.edu

HP dc5100

9.4.43

quick-w20-copy1.mit.edu

HP dc5100

debathena

quick-w20-copy2.mit.edu

HP dc5100

debathena

quickstation-new-house.mit.edu

HP dc5100

debathena

w20-lobby-quick1.mit.edu

HP dc5100

debathena

w20-lobby-quick2.mit.edu

HP dc5100

debathena

quick-edgerton-2.mit.edu

Optiplex 620

debathena

quickstation-bexley.mit.edu

Optiplex 620

debathena

quickstation-random-hall.mit.edu

Optiplex 620

9.4.27

quickstation-senior-house.mit.edu

Optiplex 620

debathena

quickstation-westgate.mit.edu

Optiplex 620

debathena

quickstation-eastgate.mit.edu

Optiplex 620

debathena

quickstation-green-hall.mit.edu

Optiplex 620

debathena

quickstation-edgerton.mit.edu

Optiplex 620

debathena

quickstation-baker-house.mit.edu

Optiplex 620

9.4.43

quickstation-east-campus.mit.edu

Optiplex 620

debathena

qs-simmons.mit.edu

Optiplex 620

debathena

quickstation-1.mit.edu

Optiplex 620

debathena

quickstation-11-1.mit.edu

Optiplex 620

debathena

quickstation-11-2.mit.edu

Optiplex 620

debathena

quickstation-11-3.mit.edu

Optiplex 620

debathena

quickstation-11-4.mit.edu

Optiplex 620

debathena

quickstation-2.mit.edu

Optiplex 620

debathena

quickstation-3.mit.edu

Optiplex 620

debathena

quickstation-4.mit.edu

Optiplex 620

debathena

quickstation-lobby-16-1.mit.edu

Optiplex 620

debathena

quickstation-lobby-16-2.mit.edu

Optiplex 620

debathena

quickstation-macgregor.mit.edu

Optiplex 620

debathena

quickstation-mccormick.mit.edu

Optiplex 620

debathena

quickstation-next-house.mit.edu

Optiplex 620

debathena

quickstation-boathouse.mit.edu

Optiplex 745

9.4.43

quickstation-7-4.mit.edu

Optiplex 745

debathena

quickstation-tang.mit.edu

Optiplex 745

debathena

quickstation-w35-1.mit.edu

Optiplex 745

debathena

qs-chickensoup-1.mit.edu

Optiplex 755

9.4.49

quickstation-burton-conner.mit.edu

Optiplex 755

debathena

qsnw35-1.mit.edu

Optiplex 755

debathena

qsnw35-2.mit.edu

Optiplex 755

debathena

quickstation-baker2-house.mit.edu

Optiplex 755

debathena

quickstation-50-1.mit.edu

Optiplex 755

9.4.54

quick-1-150.mit.edu

Optiplex 755

debathena

Upgrade remaining quickstations to Debathena

jdreed will inquire with hotline about a possible schedule for upgrading remaining quickstations

Upgrade dorm cluster machines to Debathena

Quickstations will get upgraded as noted above.

Dorm

Hostnames

Status

MacGregor

macgregor-1 through -6

(warning)-5 requires reinstall

McCormick

mccormick-1 through -7

(warning)-1 is off net

New House

newhouse-1 thought -6

(tick)

Next

next1 through next6

(tick)

NW30

nw30-1, nw30-2

(tick)

NW35 (New Ashdown)

nw35-1 through nw35-4

(tick)

SidPac

pacific-1 through -3

(warning) pacific-3 is Debathena. Are pacific-1 and -2 Windows?

Tang

ultra5-tang-1, ultra5-tang-2

(tick)

Simmons

simmons-1 through simmons-5

(tick)

Craft documentation for data migration

jdreed will craft documentation in Hermes for migrating local data.

Outreach to private workstation owners

Complete Debathena PWOG

Completed. Located at http://kb.mit.edu/confluence/x/eSVB.

Ensure OLH documents are updated