Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • David Taylor Model Basin Reports Wiki page:
    • These are currently being scanned in Document Services.  These 1,000 reports will go in Dome.  I have attached the spreadsheet with the metadata.  The reports will not be finished scanning for another week.
    • Sending spreadsheet for the metadata to begin testing.  The pdfs and tiffs will be on DSpace Images. (tick)
    • Expect to be ready to load mid-late-January
  • MIT Energy Reports:
    • 447 technical reports.  The scanning in Document Services will probably not start for another 2-3 weeks.   (tick) This will be another Barton to DSpace batch so the testing should be minimal.  Selina has already worked through all of the Barton records for this project.Wiki page
  • Vail Balloon Prints:
    • Still waiting to hear from Archives if they are ready to load to production or what for the descriptive metadata.
    • Scheduled meeting with Mikki, Nora, and Carl to review the Filemaker to Archivist Toolkit migration. (meeting scheduled for 12.18.09) (tick)

...