You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Current »

Goal: drop test vehicle and deploy main parachute under flight conditions

  • Test vehicle: 2ft, 80 lbs Pathfinder tube with parachutes, nosecone, piston (not active),  and weight
  • Instrumentation: cameras, load cell, pitot-static tube, flight computer for data logging and deployment
  • Deployment: static line deployment for drogue, remotely activated release mechanism for main with tender descender or AAD
  • Measure: deployment forces (load cell or pressure-sensitive film), verify bulkhead strength, parachute drag (altimeter & accelerometer)
  • For skydiving plane:
    • Need requirements from FAA and skydiving place
    • Be confident that the drogue will not come loose before dropping
    • Determine how long of a tether is needed for static line deployment of drogue
    • Engineer how to mount weight in the nosecone, which is not designed for this load

Ideas:

  • Tow behind or push out of small aircraft (preferably skydiving plane with no door)
  • Launch recovery system on an instrumented rocket
  • Vertical wind tunnel
  • No labels